Apr 17
Bids in
16 days

11373 Runway And Taxiway Rehabilitation #17844

(H-NR-E)* The Contractor shall maintain traffic in the manner detailed in the Construction Safety and Phasing Plan (CSPP). Use such material in another contract item, providing such use is approved by the RPR and is in conformance with the contract specifications applicable. All existing structures encountered within the established lines, grades, or grading sections shall be removed by the Contractor, unless such existing structures are otherwise specified to be relocated, adjusted up or down, salvaged, abandoned in place, reused in the work or to remain in place.

Status

Accepting Bids

Prebid Date 4/10/25 9:00am
Bid Date 4/17/25 10:00am

Company & Contacts

Shows, Dearman & Waits Inc
Lamar Rutland  
601-544-1821

Location

Waynesboro, MS